Eiffage

Business lines

We develop our activity in different energy sectors, carrying out projects of great importance. We offer a wide range of services for private and public clients.

Projects

Selection of some of the most relevant projects in each of our business lines.

Sustainability and Innovation

For Eiffage Energía Sistemas Group, low-carbon construction is one of the main targets, being also an opportunity to make a difference in terms of sustainability.

Responsibility

Corporate Social Responsibility is one of the essential practices for the company, being one of the main axes in all our branches and subsidiaries around the world.
This CSR policy must respect all employees, communities and also environment, with the integration of ethical values.

Persons

Working at Eiffage Energía Group is a great choice. We take care of our employees and offer them training and development within the company, even having the possibility of being part of the shareholders.

Communication

Find here the latest news from Eiffage Energía Sistemas Group and stay informed of our activity through LinkedIn.

Contact

Find here all our national and international branches.

Monforte Wind Farms

The project includes two wind farms, two substations and a high-voltage line. This is the Cluster Jiloca project, which has total installed power of 73 MW and which has involved some 300 professionals in its construction.
Monforte I Wind Farm

The Monforte wind farms are already in operation. The first farm has total installed power of 50 MW. In addition, it has 13 x 3.83 MW wind turbines, 14.9 km of access roads, internal roads and 13 platforms. Construction involved 12.5 km of trench, laying and connection of medium voltage network and fibre optics.
Monforte II Wind Farm

In this case, total installed power is 23 MW. It also has 6 wind turbines of 3.83 MW, 3.1 km of access roads, internal roads, 6 platforms, foundations and a medium voltage network. 5.8 km of trench, laying and connection of medium voltage network and fibre optics were also executed. Muniesa and Monforte Substations We at Eiffage Energía also carried out civil works, electromechanical assembly, testing and start-up of the Muniesa and Monforte substations as part of the Cluster Jiloca. They have a control and protection system, a communication system, an anti-intrusion and fire protection system. As well as the installation of auxiliary services with a 160kVA transformer. Monforte-Segura High Voltage Line Lastly, it is worth highlighting the civil works, assembly and raising of towers and cable laying for a 220kV High Voltage line, 10km, a simple duplex circuit and 35 supports. Eiffage Energía has built 5.6 GW of renewable energy and is expected to easily exceed 6 GW by the end of the year.

Business line:
parque-eolico-monforte

Customer:

Coronation

Budget:

Duration:

2019-2020

Location:

Zaragoza, Teruel (Spain)

Eiffage Energía Sistemas
Privacy Summary

Welcome to the basic information about cookies on the website under the responsibility of the entity: Eiffage Energía SLU

A cookie or computer cookie is a small information file that is saved on your computer, smartphone or tablet each time you visit our website. Some cookies are ours and others belong to external companies that provide services for our website.

Cookies can be of various types: technical cookies are necessary for our website to function, they do not require your authorization and they are the only ones that we have activated by default.
The rest of the cookies are used to improve our page, to personalize it based on your preferences, or to be able to show you advertising tailored to your searches, tastes and personal interests. You can accept all these cookies by pressing the Accept all button or configure them or reject their use by clicking on the section configure cookies.

If you want more information, consult the cookies policy of our website.