Search
Close this search box.
Search
Close this search box.

Eiffage

Business lines

We develop our activity in different energy sectors, carrying out projects of great importance. We offer a wide range of services for private and public clients.

Projects

Selection of some of the most relevant projects in each of our business lines.

Sustainability and Innovation

For Eiffage Energía Sistemas Group, low-carbon construction is one of the main targets, being also an opportunity to make a difference in terms of sustainability.

Responsibility

Corporate Social Responsibility is one of the essential practices for the company, being one of the main axes in all our branches and subsidiaries around the world.
This CSR policy must respect all employees, communities and also environment, with the integration of ethical values.

Persons

Working at Eiffage Energía Group is a great choice. We take care of our employees and offer them training and development within the company, even having the possibility of being part of the shareholders.

Communication

Find here the latest news from Eiffage Energía Sistemas Group and stay informed of our activity through LinkedIn.

Contact

Find here all our national and international branches.

Autotransformer station works and maintenance, and power remote control on a section of Madrid-Galicia high-speed (AVE) line

ADIF awarded Eiffage Energía, in a temporary joint venture with Telice S.A., a works and maintenance contract for the autotransformer stations and power remote control on the Pedralba-Orense section of the Madrid-Galicia AVE line, with a budget of over 10 million euros and a duration of 9 months.

The works consisted of:

The construction of several autotransformer stations for the catenary power supply system planned by ADIF for the aforementioned high speed section.
The 2×25 kV electrification system supplies power at a voltage of 50 kV, between the contact line and the feeder, and the rolling stock picks up power at a voltage of 25 kV between the contact line and the rail. The installation of autotransformers with a 55/27.5 kV ratio is therefore required approximately every 15 kilometres.
To house these autotransformers and their auxiliary equipment, there are plans to construct two types of trackside facilities, depending on whether the autotransformers are installed close to the neutral zones between substations, final autotransformer stations (FAS) or on the track section, intermediate autotransformer stations (IAS).
Each traction substation has its own area, including the autotransformer stations associated with the area substation, defined as the section of catenary that is powered by the substation in question in normal operating mode, not degraded mode.

Maintenance will be performed over 24 months, once the construction of the autotransformer stations is complete. Work will include:

Predictive maintenance, performed at predefined intervals, or in accordance with established criteria, intended to reduce the likelihood of the failure or degraded operation of certain components.
Corrective maintenance, performed after the recognition of a failure, intended to restore the component in question to a status in which it can perform the required function.

renfe-adif

Customer:

ADIF

Budget:

€10 million

Duration:

9 months

Location:

Pedralba-Orense (Spain)