Search
Close this search box.
Search
Close this search box.

Eiffage

Business lines

We develop our activity in different energy sectors, carrying out projects of great importance. We offer a wide range of services for private and public clients.

Projects

Selection of some of the most relevant projects in each of our business lines.

Sustainability and Innovation

For Eiffage Energía Sistemas Group, low-carbon construction is one of the main targets, being also an opportunity to make a difference in terms of sustainability.

Responsibility

Corporate Social Responsibility is one of the essential practices for the company, being one of the main axes in all our branches and subsidiaries around the world.
This CSR policy must respect all employees, communities and also environment, with the integration of ethical values.

Persons

Working at Eiffage Energía Group is a great choice. We take care of our employees and offer them training and development within the company, even having the possibility of being part of the shareholders.

Communication

Find here the latest news from Eiffage Energía Sistemas Group and stay informed of our activity through LinkedIn.

Contact

Find here all our national and international branches.

Work on the field hospital facilities at the Albacate Medical School executed in record time

The Albacete field hospital coordinated by Eiffage Energía is ready

The Albacete field hospital, construction of which was coordinated and executed by Eiffage Energía, is now ready. Partnered by Albacete University Hospital Complex, Eiffage Energía carried out the design, implementation, coordination and execution of the field hospital facilities at the Albacete Medical School. The facility is ready for referral of Covid19 patients to free up beds in the hospital. Always according to the professional criteria of CHUA. These exceptional facilities, construction of which began on 1 April, offer 198 beds over an area of 2,500 m2 set up for patients, with the aim of decongesting the General University Hospital of Albacete and avoiding overloading of its facilities.

Experience in emergency health infrastructures

Eiffage Energía’s experience in facilities with a high level of technical difficulty allowed this project to be completed in record time, as the work was completed in three days, and with the highest guarantees. The work consisted of installing new electrical outlets, a new telecommunications network, operations involving electrical panels on emergency lines. Thereby ensuring electrical continuity in all equipment, as well as the installation of lavatories, washbasins, toilets, and water supply outlets. In addition, it is fully air-conditioned and equipped with a complete gas network for oxygen support.

 

 

 

 

 

 

 

 

 

 

More than 30 technicians working 24 hours a day

The facilities were built by more than 30 of the group’s qualified technicians, following the most stringent hygienic-sanitary guidelines and conditions. Of course, with the use of top-level, high-quality PPE and continuous disinfection of the facilities. As well as preventive talks, preliminary analysis, planning and coordination of work in an orderly and clean manner.                   Work was carried out on an uninterrupted basis 24 hours a day, with three shifts. Tremendous effort by our professionals to get the Albacete field hospital, coordinated by Eiffage Energía, ready.

Also participating, in addition to Eiffage Energía’s specialists and technicians on site, were the architectural firm Hueros-Toledo Arquitectos, Bueno Arenas, Iniesta Palomares, for plumbing, and Pegisdan for installation of gases. As well as Luxiona Group, Rexel Spain, Sonepar Group and Electro-Stocks Group.

Listo-el-Hospital-de-campaña-de-Albacete-coordinado-por-Eiffage-Energía