News
In a joint venture with Tr Construya, Eiffage Energía Sistemas will install several photovoltaic solar panels on canopies at the “El Carmen” University Campus of the University of Huelva.
These installations will be located at three car parks on the Campus, These locations are:
• the esplanade behind...
05 December 2023, 10:06
In partnership with the developed Batipart, Conscytec, Eiffage Energía Sistemas’s subsidiary is constructing Spain’s first wooden-structured ‘coliving’ space in the Madrid’s district of Tetuán. Artelia (Project Manager) and the architectural studio sAtt also participated in the project.
Cuatro...
28 November 2023, 10:31
Through its Installations Department, Eiffage Energía Sistemas will be responsible for the interior adaptation of Hall One at the Palace of Exhibitions and Congresses in Dos Hermanas, Seville.
The hall is situated between Avenida de las Universidades and the Seville-Cádiz railway line, and is bordered...
21 November 2023, 09:09
Innovation and Health Awards. Eiffage Energía Sistemas emerged as one of six finalists in the Large Company category at the VIII Edition of the Mutua Universal Innovation and Health Awards, securing a runner-up position. These awards honour innovation for the benefit of people.
Juan Pablo Valverde...
15 November 2023, 10:36
An open day was held last Friday, the 10th of November, organised by the developer Nido Zero at the construction site of the first Passivhaus residential development in Castilla-La Mancha, which is being built by our subsidiary Eiffage Conscytec in Albacete, designed by Relatio and managed by Ingeteo.
It...
13 November 2023, 10:43
A group of 16 students from the Bachelor’s Degree in Electrical Engineering and the Master’s Degree in Renewable Energies from our partner University of Castilla-La Mancha visited the 2,313 MWp El Cuco photovoltaic plant, located in Montealegre del Castillo, Albacete, to see firsthand a...
10 November 2023, 11:51
The magazine INFOENERGÉTICA has interviewed the International and Renewable Energies Director of Eiffage Energía Sistemas, Daniel Garrido, about the company’s newly initiated project to generate renewable hydrogen through water electrolysis.
Garrido emphasizes that Eiffage Energía Sistemas...
31 October 2023, 10:19
As part of the celebration of the 20th anniversary of Eiffage Energía Sistemas the company organised an Open Day on Saturday 21 October, inviting our families to discover our workplace first hand.
As part of this event, the headquarters, located in Albacete, opened its doors to partners, daughters...
23 October 2023, 11:13
Eiffage Energía Sistemas is one of the groups awarded the contract for the integral service for performing adaptation works on Sareb’s properties, particularly for residential assets. This contract has an initial estimated value of 56 million euros for the next two years, which could be extended...
17 October 2023, 08:22
We have now selected the winners of the II Photography Competition aimed at employees of the Eiffage Energía Sistemas Group, as part of the celebrations to mark the company’s 20th anniversary. The panel consisted of four people who hold management positions in the company.
On this occasion, the categories...
11 October 2023, 11:16
We have been selected to supply and install four solar trees in the city of Valencia.
The project, which we are working on for the Valencia City Council, aims to install solar trees to power several electric charging points for bicycles and scooters, as well as mobile devices such as phones, tablets...
10 October 2023, 11:20
We are SHAREDOERS. Yes, you read that right.
At Eiffage Energía Sistemas we are Sharedoers because most of us who work here hold SHARES in the company and DO everything we can to make things possible.
We DO everything to make the circular economy part of our DNA.
What about constructing buildings...
02 October 2023, 11:29
Ballestas and Casetona. Our Renewable Energy department is in charge of assembling and commissioning the main equipment of the Ballestas and Casetona photovoltaic plants for Iberdrola in Revilla Vallejera, Burgos. These plants, with capacities of 41 MW and 33 MW, respectively, will consist of over...
26 September 2023, 10:57
From 18 September to 8 October the European Sustainable Development Week is being held to promote the green transition by encouraging local action and raising public awareness of sustainable development. Almost at the same time, from 16 to 22 September, we are celebrating European Mobility Week with...
19 September 2023, 10:57
Eiffage Energía Sistemas has now produced its first kilograms of renewable H2. We achieved this milestone through a pilot project involving the production of renewable hydrogen via the electrolysis of water. This pioneering project has recently been categorised as R&D.
After completing rigorous...
13 September 2023, 09:55
The Provincial Government of Ciudad Real has entrusted Eiffage Energía Sistemas with the task of renewing the public lighting in the municipality of Picón. The objective is to replace the existing street lights with new LED technology ones, in accordance with the Municipal Sustainable Investment Strategic...
06 September 2023, 08:27
We have just taken delivery of 12 trucks fitted with articulated hydraulic cranes from Palfinger, a major manufacturer and partner in our innovation, sustainability and safety strategy.
These cranes will be used for distribution, maintenance and construction work on low, medium and high voltage networks,...
24 August 2023, 10:57
2022 was a successful year for Eiffage Energía Sistemas in both Spain and South America, with a record number of wind and photovoltaic plants built, exceeding 1 GW of installed capacity.
Notable projects include Arcos (233 MW) and Pizarro (200 MW), which confirm our consolidation in Spain while we...
08 August 2023, 08:59
In June we started the construction of “El Cuco” 42.313 MWp photovoltaic plant for Aquila Clean Energy in Montealegre del Castillo, Albacete. A facility that will generate clean energy to supply 19,500 homes per year.
This EPC project, which is expected to be operational in 2024, will generate around...
27 July 2023, 10:31
Palma de Mallorca. Eiffage Energía Sistemas is going to undertake, through the Facilities Department of the Eastern Zone, the retrofitting works of a multipurpose building, located at Calle Felicià Fuster, 7 in Palma de Mallorca. It is a building belonging to the Ministry of Territorial Policy and...
19 July 2023, 10:10