Search
Close this search box.
Search
Close this search box.

Eiffage

Business lines

We develop our activity in different energy sectors, carrying out projects of great importance. We offer a wide range of services for private and public clients.

Projects

Selection of some of the most relevant projects in each of our business lines.

Sustainability and Innovation

For Eiffage Energía Sistemas Group, low-carbon construction is one of the main targets, being also an opportunity to make a difference in terms of sustainability.

Responsibility

Corporate Social Responsibility is one of the essential practices for the company, being one of the main axes in all our branches and subsidiaries around the world.
This CSR policy must respect all employees, communities and also environment, with the integration of ethical values.

Persons

Working at Eiffage Energía Group is a great choice. We take care of our employees and offer them training and development within the company, even having the possibility of being part of the shareholders.

Communication

Find here the latest news from Eiffage Energía Sistemas Group and stay informed of our activity through LinkedIn.

Contact

Find here all our national and international branches.

Construction of an underground line for the Gouvaes hydroelectric power station, Portugal

Eiffage Energía is performing work on the 400 kV underground line for the Gouvaes Hydroelectric Power Station, on the Tâmega river in Portugal. The project will house four 400 kW generators, a transformer cavern with a length of 80 metres; and a vertical pit, with a maximum height of 300 metres and a diameter of 7 metres. The work consists of installing fittings in the gallery, pit and transformer cavern; laying earthing cables; and laying the underground power cable for the four 400 kV circuits. The underground cable is being laid in three parts. From the Gis substation, passing through the sloping pit access gallery; the installation of 300 vertical metres in the pit; and the transformer cavern gallery. A total of around 900 supports will be installed, where the cables will be housed in their final positions, and around 9000 metres of 400 kV cable will be laid.

tamega-hidroelectrica-gouvaes

Customer:

Iberdrola

Budget:

Duration:

2020

Location:

Gouvaes (Portugal)