Cooling power: 1.824 Kw.
Heating power: 1.260 Kw.
Institutional building of 20,000 m2.
Production of cold water through condensed air chillers with built-in hydraulic group of 912 kW each.
Production of hot water through condensing gas boilers of 630 kW each.
Water distribution by three circuits with two hot/cold pipes and a circuit with four pipes according to uses and façades. All circuits have dynamic regulation and balance with variable water flow rate.
54 Air handling units with two to four low silhouette pipes and with acoustic silencers in aspiration.
350 type fan-coil terminal units with two to four pipes for air handling in offices and meeting rooms.
Contribution of primary air by 8 Air handling units with four pipes and recovery using rotary enthalpic recuperator and variable flow rate.
1,000 m2 of low temperature underfloor heating for treatment of heating building access.
System of preparation and support of hot water for sanitary use by two thermal solar collectors.
Mechanical ventilations in warehouses, archives, toilets etc.
Centralised Technical Management System, integration of network analysers and KNX system.
Treatment of Data Processing Centre and computer server rooms through eight direct expansion autonomous units.
Customer:
SACYR.
Budget:
€1,930,000.00.
Duration:
2014 - 2015