• Eiffage
  • Business Lines
  • Projects
  • Sustainability and Innovation
  • Responsability
  • Persons
  • Communication
  • Contact

Refurbishment of Auditorium Building

Cooling power installed: 1,427 kW.
Cold water production for cooling through subsoil water condensed equipment.
Production of hot water through gas boilers.
Four water distribution pipes with variable water flow rate.
Air Handling units with free cooling and recovery by areas.
Fan coil type (hot/cold) terminal units, radiators and underfloor heating.
Overpressures in evacuation routes.
Mechanical ventilation.
Centralised Technical Management System with integration of lighting and fire protection systems.

Subsidiary:
ReformaEdificioParaninfo

Customer:

FCC Estructuras Aragón.

Budget:

Duration:

Location:

Zaragoza.