Search
Close this search box.
Search
Close this search box.

Eiffage

Business lines

We develop our activity in different energy sectors, carrying out projects of great importance. We offer a wide range of services for private and public clients.

Projects

Selection of some of the most relevant projects in each of our business lines.

Sustainability and Innovation

For Eiffage Energía Sistemas Group, low-carbon construction is one of the main targets, being also an opportunity to make a difference in terms of sustainability.

Responsibility

Corporate Social Responsibility is one of the essential practices for the company, being one of the main axes in all our branches and subsidiaries around the world.
This CSR policy must respect all employees, communities and also environment, with the integration of ethical values.

Persons

Working at Eiffage Energía Group is a great choice. We take care of our employees and offer them training and development within the company, even having the possibility of being part of the shareholders.

Communication

Find here the latest news from Eiffage Energía Sistemas Group and stay informed of our activity through LinkedIn.

Contact

Find here all our national and international branches.

Works on the electric line of Medina del campo – Salamanca

Implementation of the construction project works of electrification for the Medina del Campo-Salamanca-Fuentes de Oñoro line. Medina del Campo-Salamanca section. Substations and transformer stations associated.

The works of this project are located along the existing conventional gauge railway line between Medina del Campo-Salamanca-Fuentes de Oñoro. Medina del Campo-Salamanca section.

  • Two-phase electric traction substation (220/±27, 5 kV, 2 x 30 MVA) in Pitiagua.
  • Two stations of intermediate self-transformation (55/27,5 kV, 1 x 10 MVA).
  • Two stations of final self-transformation or neutral zone (55/27,5 kV, 2 x 10 MVA).
  • Overhead high voltage line of 220 KV, double circuit, 20 km.
  • Remote control of power installations.
Obra-Electrificacion_Medida-del-Campo-Salamanca

Customer:

ADIF (Spanish administrator of railway infrastructures)

Budget:

More than 12 million euros

Duration:

2014

Location:

Valladolid - Salamanca (Spain)